Recovery of metallic manhole grates

Descripción del Proyecto:

Cliente:
 ENAGAS TRANSPORTE
Fecha:
 MAY 2013
Categoria:
Projects

ENAGAS had the problem of recovering a set of distribution pipes in its Zahara de los Atunes plant

LIMPIEZACHORRO_800

SOLUTION

Reinnor went to the client’s installations with the mobile blasting and painting team to clean them using air pressure blasting, patch up the deteriorated areas and then give them an anticorrosion treatment that consisted of two-coat priming and a high weather-resistant finish.

Imprimación-3_mini        ACABADO-4_mini        ACABADO-Y-COLORES_mini