ENAGAS had the problem of recovering a set of distribution pipes in its Zahara de los Atunes plant
SOLUTION
Reinnor went to the client’s installations with the mobile blasting and painting team to clean them using air pressure blasting, patch up the deteriorated areas and then give them an anticorrosion treatment that consisted of two-coat priming and a high weather-resistant finish.